| | Tue Apr 3, 2007 Project Update - Red Lake Joint Venture - Progress Towards Underground Drill Program | |
|
PREMIER GOLD
MINES LTD
(PG:TSX) is pleased to
provide an update on the progress of a proposed underground drill
program from
the Red Lake Gold Mine, and the winter drill campaign on the
Rahill-Bonanza
Project (RBP), a 50-50 joint venture with partner Goldcorp Inc. (G:TSX,
GG:NYSE).
Premier
anticipates reporting assay results from the
winter drilling campaign in April.
Diamond drills have now been pulled off of the Red Lake
ice owing to
warm spring weather with the winter ice campaign being shorter (~ 6.5
weeks)
than anticipated. In all, some 10,000 metres of drilling have been
completed to
date in 2007 testing initial targets along strike from the known
deposits. The drill
program will curtail for a few
weeks to confirm the plan and schedule for the spring and summer
drilling
season.
Underground Drilling From Campbell
Complex
Premier
previously reported that it anticipated
underground drilling from the Campbell Complex onto the JV property to
begin in
late March or early April 2007. A
recent
update from Goldcorp Inc. confirms, “Underground
development is currently underway on the 41 Level at Goldcorp's
adjacent Red
Lake Gold Mine. This program includes drifting further to the
west
towards the joint venture property. Upon completion of this exploration
drift,
expected to be in the next few weeks, exploration drilling will
commence.” (See
Figure 1)
Figure
1. " Underground
Drilling from RLGM" - Please see below release
Premier views
this
drill program as its premier “high priority” target
for 2007. Red Lake Gold Mines (RLGM)
is
the highest grade gold mine in the world and is expected to produce
790,000
ounces of gold in 2007. At
December 31,
2006, Mineral Reserves and Resources for RLGM stood at 9.49 million
ounces. Goldcorp’s
exploration spending
in Red
Lake
(including the RBP) is budgeted at
US$26 million, representing almost 22% of 2007 exploration budget for
the
entire corporation.
The
goal of this program is
to attempt to demonstrate that the favourable rock-types, alteration
and
structural setting that host the high grade zones at RLGM also exist on
the
RBP. In the event
that results warrant
underground development toward the JV ground, the RBP lies immediately
along
strike from, and within 500 metres from existing RLGM infrastructure.
Meunier Claim Purchase
Premier
also announces that it has come to terms with
Mr. Dave Meunier regarding purchase of his claim that was positioned in
(and
surrounded by) the west central portion of the Rahill-Bonanza JV
property. Purchase
of this claim by Premier, for the
JV, further consolidates our strategic land position within this
prolific
district. The claim
is located in close
proximity to Goldcorp’s Cochenour and Gold Eagle’s
(GEA:TSX) Bruce Channel
projects.
Spring & Summer Drill
Programs
Premier
expects to conduct between 25,000 and 30,000
metres of drilling during the remainder of 2007 on the RBP. In addition to furthering
exploration of
targets previously identified, Premier will begin delineation drilling
on the
Bonanza Deposit, discovered in 2004, in order to produce and report a
NI 43-101
compliant resource estimate prior to the end of the year. The press release dated
December 4th,
2006 anticipated the formal joint venture agreement (JVA) with Goldcorp
Inc.
would be signed in late January 2007.
It
is now anticipated the JVA will be signed during Q2 2007. No changes to the original
Letter of Intent
have been made or proposed by either party.
Stephen
McGibbon, P.Geo., Executive Vice-President and
Chief Operating Officer of Premier, is the qualified person for the
information
contained in this press release and is a Qualified Person within the
meaning of
National Instrument 43-101.
Premier Gold Mines Limited is a
Canadian-based mineral exploration
and development company with diverse property holdings that include
several
projects and deposits in Northwestern Ontario and a joint venture in Mexico. In the Red
Lake
gold mining camp, two of these are operated in joint venture with
Goldcorp Inc.
(TSX:G). A strategic project is also located on the main Musselwhite
Gold Mine
trend (Goldcorp-Kinross).
For
further
information, please contact:
Ewan
Downie, President
Phone:
807-346-1390
Fax:
807-345-0284
e-mail:info@premiergoldmines.com
Web
Site:www.premiergoldmines.com
The statements made in this Press
Release may contain forward-looking statements that may involve a
number of
risks and uncertainties. Actual
events
or results could differ materially from the Company’s
expectations and
projections.
|
|